Manufacturing analytics tool
Downtime Analyzer
Paste simple stoppage data and identify which equipment contributes most to downtime.
Total downtime: 365 minutes
Total stoppage events: 6
| Equipment | Events | Downtime minutes | Share |
|---|---|---|---|
| Kiln Main Drive | 2 | 180 | 49.3% |
| Cement Mill Separator | 2 | 80 | 21.9% |
| Raw Mill Fan | 1 | 80 | 21.9% |
| Packing Machine | 1 | 25 | 6.8% |
This is a starter browser-based analyzer. Later versions can accept CSV uploads, Pareto charts, failure classification, and exportable reports.