Manufacturing analytics tool

Downtime Analyzer

Paste simple stoppage data and identify which equipment contributes most to downtime.

Total downtime: 365 minutes

Total stoppage events: 6

EquipmentEventsDowntime minutesShare
Kiln Main Drive218049.3%
Cement Mill Separator28021.9%
Raw Mill Fan18021.9%
Packing Machine1256.8%

This is a starter browser-based analyzer. Later versions can accept CSV uploads, Pareto charts, failure classification, and exportable reports.